5.01.2010

High School Auditorium Window Replacement


I've been working on a pretty small job lately (but hey, I'm grateful to be working): six windows need replacing in the high school's auditorium. The windows are about 8'-8" x 12'-0" and have one single-hung sash surrounded by fixed windows. The old wooden sashes are in poor shape, but most of the trim inside is salvageable.

More to come on this project as well...

3.13.2010

Old Library Renovation (Intervention)

At work lately, I have been working on documenting the existing conditions as well as the necessary work required to salvage this old schoolhouse building. The first floor of the building had been being used as the town's library (it has HVAC, the upstairs does not) until recently. There are periodicals dated April 2009 inside. The town is currently only using it to store fake garland - municipal Christmas decorations.

I need to go back and read the history of the building and site more thoroughly, but I think I recall that the building was initially built in the first quarter of the 20thC. - there have been multiple adjacent buildings built both before and after this one that have been used as school buildings. One of the ladies at work (the administrative assistant in the office, who is a grandmother of two and probably in her sixties) said her mother went to school in this building.

Problems:
-There is asbestos wrap on a pipe in the crawlspace
-There is lead-based paint in presumably every room in the building
-The roof is leaking - apparently only at the transition from shallow to steep pitch of the mansard
-Plaster (water damaged from the roof leaks) is caving in in multiple locations
-The floors, not designed or built to support rows of books are sagging big-time on the first floor
-Many of the exterior wall inside the building are badly damaged by moisture which has seeped in through the solid masonry load-bearing walls
-Most of masonry joints outside are deteriorating (we are going to have the entire exterior repointed - the joints will be ground down to an inch deep then refilled with new mortar)

[this post sat in my 'draft' queue for far too long - just need to get this off my list of things to do since construction is starting this weekend - I'll update this soon. In the meantime, there is an album of photo of the Library up on my flickr page.]

1.27.2010

Adjaye | Freelon

A few weeks ago I went to an event at North Carolina A & T State University - a speech by two architects, David Adjaye and Phil Freelon, about their work both separately and in collaboration on a National Museum of African American History and Culture for the Smithsonian on the National Mall in Washington DC. Read more about the collaboration here in Dezeen, LATimes, NYTimes, ArchRecord, etc.

(click to view larger)

Above: Phil Freelon and David Adjaye on the stage on January 6, 2010 taking questions at the end of their joint lecture at UNC A&T; last in the Triad Design Leadershop.


(click to view larger)

Among the other projects of the Freelon Group's that Phil presented were other African American Museums in Baltimore, San Francisco, and two here in North Carolina: the Harvey B. Gannt Center for African American Arts & Culture which had just opened a month or two before and The International Civil Rights Center & Museum which just opened this week in Greensboro, NC's old Woolworth's where the lunch-counter sit-in protest occurred in the 1950s. Read more in the NYTimes.

Gannt Center, Charlotte:
Civil Rights Museum, Greensboro:
(click to view larger)

Phil Freelon (Freelon Group)
David Adjaye (Adjaye Associates)